Home    Industry News    400000 ton / a organic silicon construction project in Longling County, Baoshan

400000 ton / a organic silicon construction project in Longling County, Baoshan

Hits: 3890597 2020-03-26

Find funds, find projects and invest in Yunnan
"Dianpu consulting Secretary" wechat: dianpuxiaomishu
Longling "Park in the park" is positioned as a silicon-based Industrial Park, focusing on the development of silicon-based new energy and new material industries such as silicon, polysilicon, monocrystalline silicon and solar modules.
The park is located in changlinggang area of Baoshan industrial and Trade Park, with a planned land area of about 7200 mu. It is constructed in three phases: the first phase is mainly to build 5GW / a monocrystalline silicon rod and supporting projects, management service center, the main roads of the park, Oujia road and changlinggang Road; the second and third phases are mainly to build 6Gw The industrial chain extension projects of single crystal silicon rod, silicon, polysilicon, single crystal silicon chip, solar cell chip, solar cell module, etc. are planned to achieve an industrial output value of more than 20 billion yuan by 2020, and strive to build Longling "Park in the park" into a regional characteristic international silicon-based Industrial Park based in Yunnan, facing Southeast Asia and radiating Southwest China.
At present, projects such as 5GW / a single crystal silicon rod, 6Gw / a single crystal silicon rod, silicon carbide, artificial sapphire, silicon carbide power electronic chip, graphene carbon nano electric heating film, supporting service rooms and main roads in the park are under construction. At present, Baoshan silicon based Industrial Park Longling garden Central Park plans to construct an annual output of 400000 tons of organic silicon construction project with 1000 mu of land.
Project construction content
Construction content: the building covers an area of 200000 square meters, with a total construction area of 600000 square meters. The main purpose is to build an annual output of 400000 tons of silicone production line and supporting public engineering facilities such as water supply and drainage, power supply and distribution, water treatment, and infrastructure such as fire protection, environmental protection, occupational safety and health.
Construction scale: annual output of 400000 tons of new organosilicon materials.
Construction period: 2 years
Floor area: 1000 mu
Project supporting conditions
Location advantages:
Baoshan is located in China's most convenient transportation hub to the South Asia International Grand channel, and is the best land route choice for the South China mutually beneficial cooperation strategy. It is located in the key nodes and important hub of Kunming, Ruili radiation Burma Kyaukpyu, Kunming to Tengchong radiating Burma Myitkyina to connect South Asia's two major channels and two major economic corridors, and has unique development advantages.
Transportation advantages:
Baoshan silicon based Industrial Park (longlingyuan) is connected with three expressways, 9km away from Hangzhou Ruili expressway, 1km away from the nearest entrance of the ring expressway and Changbao Expressway under construction, 15km away from Baoshan bus station and 22min by car; Dabao railway is expected to be opened to traffic in 2019, and the park has planned to build a connecting line 5km away from the railway station and 7min by car; 25km away from Darui railway station The park is surrounded by three airports, Baoshan, Tengchong and Mangshi, 8 kilometers away from Baoshan airport, and 12 minutes by car; the park is surrounded by ports such as Tengchong Houqiao, Dehong Ruili, Wanding and lincangnansan, 900 kilometers away from the nearest sea port, Myanmar Sitong port.
Power enrichment:
Baoshan City has a total installed power capacity of 2 million kilowatts, an annual power generation of 9 billion kilowatts, a power station under construction of 600000 kilowatts, and a new power generation of 2.4 billion kilowatts. In addition, the surrounding abandoned Hydropower of 6 billion kilowatts, the city can currently allocate 12 billion kilowatts of electricity. The municipal Party committee and the municipal government have the independent pricing right for the 12 billion kilowatt hours of electricity that can be allocated in the city. According to the current situation of power supply, power grid and load in the industrial and Trade Park, the power supply of the first phase of the project is guaranteed by a new double circuit 110 kV overhead line built by the 220 kV Wangjiashan substation; the medium and long-term power supply of the project is guaranteed by the 220 kV Xiajia substation and 500 kV Yongchang transmission and transformation project to be built.
Rich raw materials:
The reserves of silicon ore in western Yunnan and northern Myanmar are about 300 million tons. By the end of 2017, the production capacity of silicon metal in the western Yunnan area was 1.25 million tons, with a production capacity of 601000 tons, accounting for 96.2% and 97.8% of the province, 32.5% and 42.3% of the whole country; among them, the production capacity of silicon metal in Baoshan City was 400000 tons, with a production capacity of 2400400 tons, accounting for 31% and 39.1% of the province, and 10.4% and 16.9% of the whole country; in particular, Longling, as the only silicon industrial park in the province, has a production capacity of 250000 tons, with a production capacity of 150000 tons It accounts for 19.2% and 24.4% of the province, 6.5% and 10.6% of the whole country, providing sufficient raw materials for building silicon-based industrial clusters.
The main mining areas of silicon resources in Longling County are concentrated in Longshan, Zhen'an, Longxin, Xiangda and other towns. The county has a prospective resource reserve of about 41.6 million tons, 39 silicon ore producing areas have been found, and the estimated resource reserve is 22.6164 million tons, with an average grade of 99.2%. It has the characteristics of good transportation conditions, opencast mining, high grade and many reserves. There are 17 silica mining licenses in the county, and there are actually 15 silica mines. It is found that the resource reserves are 9.462 million tons, the resource reserves are 6.2107 million tons, and the annual production scale is 458000 tons. There are 11 silica mining enterprises, including 1 state-owned enterprise, 1 joint-stock enterprise and 9 private enterprises.
Supporting industry:
At the end of 2017, the production capacity of silicon metal in the western Yunnan area was 1.25 million tons, with a production capacity of 601000 tons. 5GW single crystal silicon rod and supporting projects were put into production in August 2017.
Pre project preparation:
The application for approval of the project land has been completed, and the supporting service rooms in the park, the main road of the park Oujia road and changlinggang road have been completed and put into use.
Preliminary benefit analysis
After the project is completed and put into operation, it is expected to achieve an annual output value of 4 billion yuan, realize a tax revenue of more than 100 million yuan, and solve the problem of employing more than 1000 people.
Investment estimation and fund raising
Investment estimate: 4 billion yuan.
Financing mode: bank loan of 1 billion yuan, self financing and financing of 3 billion yuan.
Mode of cooperation: sole proprietorship.

Online QQ Service, Click here

QQ Service

Wechat Service